Construction of Internal Infrastructure for Compressing and Dispatching Natural Gas in the
Wastewater Treatment Plant Generated by the Operation of the Amine Plant
Project for Increasing the Capacity of the Copper Smelter within the Serbia Zijin Copper d.o.o. Bor Complex
The project involves the construction of the Toyo Tires production complex in Inđija.
Construction of Building B8 - Paper Production Factory PM3 in Krnjača
Construction of a Production Facility in the Mlekara Šabac Complex, with a Processing Capacity of 250,000 Liters of Raw Milk
Reconstruction, Expansion, and Conversion of a Thermal Power Plant into a Potassium Sulfate Production Facility with a Capacity of 20,000 t/year, Construction of Smaller Structures for Auxiliary Equipment - Plant Elements, and Formation of Surrounding Concrete Plots
Construction of a Facility for the Dosing and Use of Solid Recovered Fuel (SRF) for Co-Combustion with Primary Fossil Fuels in a Rotary Kiln
Design of Two and Construction of One 5,000m3 Tank
Efficiency Enhancement of Process Furnaces at the Rijeka Refinery
Flue Gas Washing on S-2200 (Reduction of SOx Emissions)
Construction of a Urea Dosing System in the Furnaces of Boilers BF-9601 and BF-9602
FEED for Connecting the Amine Plant to the
Simplified Mining Project: Carbon Dioxide Separation from Natural Gas – Pilot Project
Completed Project of FCC for the Purpose of Obtaining Operational Permit