Client: NIS a.d. Novi Sad, Exploration and Production Block
Period: 2013 – 2014
CAPEX: € 2,390,000
Location: Oil and Gas Production and Transportation Plant Elimir (PiTNIG)
Type of Service: Engineering Services
The project aimed to enable the realization of the "Construction of an Amine Plant for Carbon Dioxide Separation from Natural Gas" project by connecting the amine plant to the PiTNIG plant facilities in Elemir and providing all necessary auxiliary fluids. The general contractor under the turnkey principle was Ludan Engineering CO. Ltd.
The project included the following technological components:
- Pipeline bridge for connecting the amine plant to the PiTNIG facilities
- Water cooling tower and HPV plant
- Instrumental air production and preparation station
- Nitrogen production and preparation plant
- CO2 vent pipe
- Connection of atmospheric and process sewers of the amine plant to the existing ones
- Fire protection system, fire alarm and gas detection system
- New gatehouse and roads
Scope of services:
- Detailed project by discipline
- Main project for Fire Protection and Hazardous Areas Study
- Environmental Impact Assessment Study
- Obtaining permits from relevant authorities
- Design supervision during construction
- Responsible contractor for all construction works
- As-built project
- Plant acceptance, commissioning, and trial operation