The project involved the design of two 5,000m3 tanks for petroleum products, including accompanying pipelines and instrumentation for connecting them to the existing product handling system, process sewerage, and fire protection system, as well as the construction of one of the tanks at the oil storage facility in Požega.
The tanks are vertical, cylindrical, with floating membranes and fixed roofs. They are placed in a shared tank area with a lower partition wall between them. A stable fire protection system was designed for the new tanks.
To meet fire protection requirements, a new extract tank, a new 800m3 steel tank for firefighting water, a new container-type diesel generator, part of the firefighting access road, and an annex to the firefighting station to house the existing and new pumps were planned.
Scope of Services: