Client: NIS a.d. Novi Sad
Period: October 2011 – October 2012
CAPEX: n/a
Location: Oil Refinery Pančevo
Type of Service: Engineering Services
The completed project of the FCC complex at the Oil Refinery Pančevo for the purpose of legalization and obtaining an operational permit included:
- S-2300 Catalytic cracking in fluidized bed
- S-2400 HDS – Hydrodesulfurization of LGO and kerosene
- S-2450 Sulfur Production - Claus
- S-2500 Gas processing
- S-2550 Mercaptan removal from liquid petroleum gas
- S-2600 Alkylation with concentrated H2SO4
- S-2750 Mercaptan removal from light gasoline fractions
- S-2850 Mercaptan removal from heavy gasoline fractions
- S-2900 Acid water treatment
- S-2950 Amine regeneration
- Reconstruction of the regenerator section of the FCC
Scope of services:
- Surveys, measurements, and testing of existing facilities and installations
- As-built project for all disciplines
- 3D model of the facility
- Static verification of key equipment and structures
- Analysis of the condition of existing equipment and installations
- Reconstruction of the regenerator section of the FCC