Simplified Mining Project: Carbon Dioxide Separation from Natural Gas – Pilot Project

Client: NIS a.d. Novi Sad, Exploration and Production Block

Period: 2013 – 2015

CAPEX: € 15,100,000

Location: Oil and Gas Production and Transportation Plant Elimir (PiTNIG)

Type of Service: Engineering Services

The project aims to separate CO2 from natural gas to enable the sale of gas and make it suitable for transportation. Acid gas removal is done using HiPACT® amine system (High Pressure Acid Gas Capture Technology) – jointly developed by JGC and BASF.

The new amine plant includes the following units:

  1. Detailed project by discipline in accordance with Serbian legislation.
  2. Main project for Fire Protection and Hazardous Areas Study.
  3. Environmental Impact Assessment Study.
  4. Obtaining permits from relevant authorities.
  5. Engineering services for the preparation of accompanying documentation in the Serbian language.
  6. Design supervision during construction.
  7. Responsible contractor for all construction works.
  8. As-built project.
  9. Plant acceptance, commissioning, and trial operation.